Kashang Stage-II & III
Capacity |
130 MW |
Design Energy (in 90% dependable year) |
790.63 MU |
Gross Head |
831.80 m |
Diversion Structure |
Trench Weir |
Head Race Tunnel |
6300 m long, D- Shaped with 3.50 x 4.5m. |
Penstock/Pressure shaft |
Steel lined (Underground), Circular Shape |
Power House |
2 No. vertical axis Pelton turbines with generating units of 65 MW each. |
Village |
Near Lippa Village |
Tehsil |
Reckong Peo |
District |
Kinnaur |
State |
Himachal Pradesh |
Last Updated On 16/08/2018