Kashang Stage-II & III

 
Capacity 130 MW
Design Energy (in 90% dependable year) 790.63 MU
Gross Head 831.80 m
Diversion Structure Trench Weir
Head Race Tunnel 6300 m long, D- Shaped with 3.50 x 4.5m.
Penstock/Pressure shaft Steel lined (Underground), Circular Shape
Power House 2 No. vertical axis Pelton turbines with generating units of 65 MW each.
Village Near Lippa Village
Tehsil Reckong Peo
District Kinnaur
State Himachal Pradesh